Projects
Library at The Dock
Client: City of Melbourne
-
Budget (approx.): $1 million.
-
Won the AVIA award for “Best Application of AV in Commercial or Government”.
-
120 seat performance space with 7.1 surround sound, digital audio mixing desk, video matrix routing, central control system, theatrical lighting with dimmers, house lighting control, hearing augmentation, and integrated lectern.
-
Recording Studio with control room and two practice rooms.
-
Interactive floor projection system, gallery projection systems for wall and floor projection.
-
Digital signage, room booking, way finding LCD screens, interactive tables and touch screens.
-
Fully-integrated meeting rooms.
-
Large LED video wall on exterior façade of the building.
-
IP-rated display system in semi-outdoor area and satellite TV distributed over the network.
-
Featured in multiple magazines.
Centre for Joint Integration (SA)
Client: Raytheon
-
Budget (approx.): $600,000.
-
Featured cutting-edge technology, installed into a large Boardroom, other Meeting Rooms, and Training Rooms.
-
24 Room Booking Panels were installed throughout the facility.
-
Provided full end-to-end consulting services, along with AV Contractor management.
Federation Hall (VCA)
Client: University of Melbourne
-
The Hall can be used as a cinema, recital space and lecture theatre, and therefore requires complex and versatile AV systems.
-
Provided audit, design, tendering, contractor management and QA services.
-
Managed the replacement of the Dolby Digital surround sound system.
-
Redesigned the main AV rack systems in the bio box.
-
Designed a new fully-integrated lectern.
-
Delivered a successful outcome, with the facility now heavily utilised.
Faculty Upgrade Project
Client: University of Melbourne
-
Budget (approx.): $5 million.
-
Involved the upgrade of 170 faculty spaces, over 2.5 years.
-
Acted as the ‘Prime’, and managed all building works and coordination.
-
Involved seven batches of spaces, with multiple tranches within each batch.
-
Each tranche involved its own tender and installation contracts.
-
Completed on-time and budget in Winter 2019.
Burwood Campus Development
Client: Deakin University
-
Budget (approx.): $1.35 million.
-
20 spaces spread across seven buildings.
-
Combination of classrooms and meeting rooms.
-
Coordination with architect, builder, and other services.
-
Provided full end-to-end consulting services.
Building M
Client: Deakin University
-
Budget (approx.): $650,000.
-
Featured six wet labs, and three meeting rooms.
-
Provided full end-to-end consulting services.
-